Fauzi, Wilda Nia (2011) Analisis Ulang Perhitungan Penulangan Pelat Lantai 1 dengan Metode Perencanaan Lansung Berdasarkan SNI 03-2847-2002 pada Proyek Pembangunan Gedung Kantor PT Bank Pembangunan Daerah Cabang Solok. Diploma/Proyek Akhir thesis, Universitas Negeri Padang.
![B1_2_WILDA_NIA_FAUZI_03222_2011.pdf.pdf [thumbnail of B1_2_WILDA_NIA_FAUZI_03222_2011.pdf.pdf]](https://repository.unp.ac.id/style/images/fileicons/text.png) Text
            
              
Text
B1_2_WILDA_NIA_FAUZI_03222_2011.pdf.pdf
Download (16MB)
Abstract
Field Industries (PLI) is one of the requirements for Student D-3 (Diploma) to 
complete the study in the Department of Civil Engineering Faculty of Engineering, State 
University of Padang. By following the PLI students can see first hand how the 
implementation mechanisms to the field work in the field, while also being able to compare 
theoretical science students gained on the bench with the application of science lectures in the 
field. 
PT Bank Pembangunan Daerah Regional Development Solok branch aims to 
provide maximum service to our customers Solok and surrounding areas with a more 
representative offices. 
Activities by the author during the practice field during the 33-day industry are as 
follows: the orientation of the field, observing the work Ground Tanks, concrete retaining 
wall work, foundation work fence, the work columns, beams and slab work, and 
consultations with counselors in the field. 
During the field practice of industry writers get some interesting findings that one 
of the authors adopted a case study and set forth in the final task of the writer, entitled "Re-Analysis Calculations Floor reinforcement plate 1 with the Planning Method Based Direct 
SNI 03-2847-2002 on Building Construction Projects Office of PT Bank Pembangunan 
Daerah Regional Development Solok ". 
i
Calculations by the author with 120 mm thick plate is quite safe and able to withstand 
the influence of shear. And dimensions of the reinforcement in the direction of widening and 
lengthening the floor plate 1 which economic basis of the results the authors get is p8-190 
because of the distance used is not too large and can facilitate the work
| Item Type: | Thesis (Diploma/Proyek Akhir) | 
|---|---|
| Subjects: | T Technology > TA Engineering (General). Civil engineering (General) | 
| Divisions: | Fakultas Teknik > Teknik Sipil Bangunan Gedung-D3 | 
| Depositing User: | Dina Aulia Sari S.IP | 
| Date Deposited: | 31 Jan 2025 08:54 | 
| Last Modified: | 31 Jan 2025 08:55 | 
| URI: | https://repository.unp.ac.id/id/eprint/524 | 
 
         