Rifenta, Yogi (2011) Produktivitas Alat Gali Muat (Backhoe), dan Alat Angkut (Dump Truck) Untuk Mencapai Target Produksi BB 45.000 ton dan OB 180.000 BCM di Lokasi Penambangan MT4 Swakelola III TAL PT. Bukit Asam (Persero) Tbk. Diploma/Tugas Akhir thesis, Universitas Negeri Padang.
B1_14_YOGI_RIFENTA_76451_2011.pdf.pdf
Download (3MB)
| Item Type: | Thesis (Diploma/Tugas Akhir) |
|---|---|
| Contributors: | Contribution Contributors Email Thesis advisor Abdullah, Rijal UNSPECIFIED Corrector Murad, Murad UNSPECIFIED Corrector Ansosry, Ansosry UNSPECIFIED |
| Uncontrolled Keywords: | ALAT ANGKUT, ALAT MUAT |
| Subjects: | T Technology > TN Mining engineering. Metallurgy |
| Divisions: | Fakultas Teknik > Teknik Pertambangan-D3 |
| Depositing User: | Mutia Farida S.Sos |
| Date Deposited: | 13 Mar 2025 08:19 |
| Last Modified: | 13 Mar 2025 08:19 |
| URI: | https://repository.unp.ac.id/id/eprint/3754 |
