Kajian Teknis Sistem Penyaliran Tambang pada Penambangan Batubara PT. Kuansing Inti Makmur Muara Bungo Jambi

Juwanda, Ardi (2016) Kajian Teknis Sistem Penyaliran Tambang pada Penambangan Batubara PT. Kuansing Inti Makmur Muara Bungo Jambi. Bachelor/Skripsi thesis, Universitas Negeri Padang.

[thumbnail of final_B1_14_ARDI_JUANDA_3218_1102408_2016.pdf] Text
final_B1_14_ARDI_JUANDA_3218_1102408_2016.pdf

Download (4MB)

Abstract

PT. Kuansing Inti Makmur is a company engaged in coal mining has a mining permit ( IUP ) that located in Tanjung Belit, Kecamatan Jujuhan, Bungo Regency, Province of jambi . PT . Kuansing Inti Makmur mining operations with a system of open-pit system (surface mining), which uses the method of open pit mine that will form the basin. Penyaliran system applied to the Mine site PT . Kuansing Inti Makmur is mine dewatering system by allowing water to pour into the mine site to be accommodated in the reservoir (sump) and then released outside of the mine with pumps . and Mine Drainage system that is preventing the water to get into the mine site by making the channel around the pit so that the water does not get into the mine . Catchment area in east pit PT. Kuansing Inti Makmur Covering an area of 182,5 hectares and catchment area-2 in east pit of 68 hectares. Maximum capacity sump to collect water runoff and groundwater amounted to 297.164 m3. Open channel cross-section shape that is created is the trapezium. The first channel is located in the pit which serves to drain water to the Main Sump,the second channel is located in the southern part of the pit which serves to reduce the discharge water runoff will go. Pumping systems were performed using HDPE pipes and pumps used is a centrifugal pump Multiflow MF-420 E, which has a maximum head 152 meter and pump discharge to a maximum of 370 liters / sec as a four unit. Results of pumping flowed into on the mud settling ponds (KPL) with a maximum volume settling pond of 10499 m3. Settling ponds serves to neutralize harmful substances from the water pumping results before being drained into the river.

Item Type: Thesis (Bachelor/Skripsi)
Contributors:
Contribution
Contributors
Email
Thesis advisor
Tamrin, Tamrin
UNSPECIFIED
Thesis advisor
Yunasril, Yunasril
UNSPECIFIED
Corrector
Abdullah, Rijal
UNSPECIFIED
Corrector
Prabowo, Heri
UNSPECIFIED
Corrector
Anaperta, Yoszi Mingsi
UNSPECIFIED
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Fakultas Teknik > Teknik Pertambangan-S1
Depositing User: Sudia Ajjronisa S.Sos
Date Deposited: 06 Nov 2025 23:31
Last Modified: 03 Sep 2026 08:31
URI: https://repository.unp.ac.id/id/eprint/28595

Actions (login required)

View Item
View Item