Cahyadi, Eka Putut (2017) Effisiensi Penggalian Pada Kapal Keruk 19 Bangka 2 Terhadap Laju Pemindahan Tanah di Laut Paya Kundur PT. Timah (Persero) Tbk Unit Produksi Kundur Wilayah Operasi Kepri & Riau. Diploma/Proyek Akhir thesis, Universitas Negeri Padang.
![B1_12_EKA_PUTUT_CAHYADI_14080021_4843_2017.pdf.pdf [thumbnail of B1_12_EKA_PUTUT_CAHYADI_14080021_4843_2017.pdf.pdf]](https://repository.unp.ac.id/style/images/fileicons/text.png)
B1_12_EKA_PUTUT_CAHYADI_14080021_4843_2017.pdf.pdf
Download (4MB)
Abstract
PT. Timah (Persero) Tbk Kundur Production Unit is a unit of production
that mines tin in the sea using dredgers and cutter suction dredges, one of them
uses 19 Bangka 2 Dredger, which has a capacity of 22 Cuft bucket. The method
that is used by 19 Bangka 2 Dredger is short face mining which works under
excavation by dividing into slices with a length of 30 meters. It is used a
combination systemwhich is the incorporation of advanced system andpress
system.
Based on field observations and calculations performed on the data that
had been collected, theexcavation efficiency was only at 91% of the topsoil with
the rate of earth moving of 650.194 m3/ h, while the efficiency of the
kaksaexcavation earthworks by 45.71% with the rate earth moving of 193.064 m3/
hour. It showed the efficiency of the excavation was not optimal / ideal.
One of the ways to increase the efficiency is to increase the rate earth
moving by maximizing filling bucket. In order to get a maximum filling bucket is
to increase the speed of the wire sliding sideways and add depth emphasis ladder.
Wire-speed data processing side is increased from 8 m / minute to 12.424 m / min
and an emphasis ladder plus 0.26 m to 0.3 m at the excavation of top soil and
kaksasoil plus 0.20 m to 0.3 m.
Thus, the rate of earth moving on the excavation of top soil increased from
650.194 m3/ h to 714.49 m3/ h with efficiency increased to 108.67% from 98.89%,
andthe rate of earth movingof the excavation of kaksatopsoil increased from
193.064 m3/ h to 337.85 m3/ h with the efficiency increased to 88% from 29.36%.
Item Type: | Thesis (Diploma/Proyek Akhir) |
---|---|
Uncontrolled Keywords: | Efisiensi, Penggalian, Laju Pemindahan Tanah |
Subjects: | T Technology > TN Mining engineering. Metallurgy |
Divisions: | Fakultas Teknik > Teknik Pertambangan-D3 |
Depositing User: | Risna Juita S.Sos |
Date Deposited: | 26 Feb 2025 02:16 |
Last Modified: | 26 Feb 2025 02:16 |
URI: | https://repository.unp.ac.id/id/eprint/2726 |