Perbandingan Time Schedule Perencanaan dengan Pelaksanaan pada Proyek Normalisasi Sungai Batang Mangguang dan Batang Piaman, Kota Pariaman.

Robican, Robican (2012) Perbandingan Time Schedule Perencanaan dengan Pelaksanaan pada Proyek Normalisasi Sungai Batang Mangguang dan Batang Piaman, Kota Pariaman. Diploma/Tugas Akhir thesis, Universitas Negeri Padang.

[thumbnail of B1_ROBICAN_03243_181_2012.pdf.pdf] Text
B1_ROBICAN_03243_181_2012.pdf.pdf

Download (341kB)

Abstract

With the construction of the normalization of the river bars and rodspiaman mangguang selaian mengatsai expected to flood, normalisaisi projectis beneficial for the development of Pariaman city tour, due to its locationalong the stem the flow of mangguang could be an attraction to be developedas a tourist attraction daearah mangguang beach.At the industrial field practice activities on the Project normalissiriver rod and rod mangguang piaman for ± 33 days of work, the authors areinterested in trying to discuss about the comparison time schedule with theimplementation of this Plan as a case study in this final project penulisn.Obtained from the analysis, we can see the weight ratio of 180 dayswith 204 days, where the weights are there and there is also addition ofreduction in weight, it is because of the addendum activities.

Item Type: Thesis (Diploma/Tugas Akhir)
Uncontrolled Keywords: TEKNIK SIPIL, IRIGASI, NORMALISASI SUNGAI
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TC Hydraulic engineering. Ocean engineering
Divisions: Fakultas Teknik > Teknik Sipil Bangunan Gedung-D3
Depositing User: Mutia Farida S.Sos
Date Deposited: 18 Feb 2025 01:35
Last Modified: 18 Feb 2025 01:35
URI: https://repository.unp.ac.id/id/eprint/1959

Actions (login required)

View Item
View Item