Zalman, Nofri (2012) Teknis Pelaksanaan Pemancangan Dinding Sheet Pile dan Pilecap. Diploma/Tugas Akhir thesis, Universitas Negeri Padang.
![B1_NOFRI_ZALMAN_06069_477_2012.pdf.pdf [thumbnail of B1_NOFRI_ZALMAN_06069_477_2012.pdf.pdf]](https://repository.unp.ac.id/style/images/fileicons/text.png)
B1_NOFRI_ZALMAN_06069_477_2012.pdf.pdf
Download (1MB)
Abstract
The Construction of this project is a step to minimize flooding and coastalerosion in Pariaman. Most of the residents who live by the beach especiallyPariaman frequently encountered by large waves and sea erosion in the riverchannel edge. Caused due to siltation of water channels in the river, so water cannot be fixed on one of the river and will be continued erosion of the coastlinewhere the sea would seem to grow larger and the mainland will grow more andmore narrow, which resulted in settlements will experience flooding. One of theefforts by the government to build a sea wall and cliff retaining walls that aims toprotect human settlements from coastal erosion and overflow of river water due totidal waves.Normalization job Muara Sungai Batang and Batang Pariaman wat that isin swampy areas. Soil retaining walls on the banks of the river was selected sheetpile wall. Sheet pile wall which has a length of 8 m is planned to reach the groundfoundation that can withstand lateral earth pressure active, passive and can alsowithstand water pressures and scour of the river at River normalization project.
Item Type: | Thesis (Diploma/Tugas Akhir) |
---|---|
Uncontrolled Keywords: | TEKNIK SIPIL, JEMBATAN |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) T Technology > TE Highway engineering. Roads and pavements |
Divisions: | Fakultas Teknik > Teknik Sipil Bangunan Gedung-D3 |
Depositing User: | Mutia Farida S.Sos |
Date Deposited: | 17 Feb 2025 08:09 |
Last Modified: | 17 Feb 2025 08:09 |
URI: | https://repository.unp.ac.id/id/eprint/1939 |