Teknis Pelaksanaan Lining Saluran Primer Proyek Rehabilitasi dan Pembuatan Jaringan Irigasi Batang Anai Tahap II Kabupaten Padang Pariaman.

Scorpia, Aldi Maulana (2012) Teknis Pelaksanaan Lining Saluran Primer Proyek Rehabilitasi dan Pembuatan Jaringan Irigasi Batang Anai Tahap II Kabupaten Padang Pariaman. Diploma/Tugas Akhir thesis, Universitas Negeri Padang.

[thumbnail of B1_ALDI_MAULANA_SCORPIA_03025_183_2012.pdf.pdf] Text
B1_ALDI_MAULANA_SCORPIA_03025_183_2012.pdf.pdf

Download (1MB)

Abstract

In the implementation of the primary channel lining work, one thing tonote is about the condition of land used for excavation and pile on the levee andirrigation channels carried on the canal foundry linning. Land used for excavationand embankment should have a good characteristics so that the lining andstrengthening the levees in irrigation channels sturdy and durable.To obtain soil characteristics suitable in use for excavation and pile on thelevee, first performed in the field of materials testing and subsequently forwardedto the testing dilaboratum.From the analysis, the authors conclude that in all forms of work, shouldbe done with the correct method and need good supervision in every form of workto conform to predetermined specifications

Item Type: Thesis (Diploma/Tugas Akhir)
Uncontrolled Keywords: IRIGASI, SALURAN AIR
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
Divisions: Fakultas Teknik > Teknik Sipil Bangunan Gedung-D3
Depositing User: Mutia Farida S.Sos
Date Deposited: 14 Feb 2025 04:37
Last Modified: 14 Feb 2025 04:37
URI: https://repository.unp.ac.id/id/eprint/1766

Actions (login required)

View Item
View Item