Putra, M ILham Marda (2018) Optimalisasi Alat Muat Dan Angkut Untuk Ketercapaian Target Produksi Overburden Pada Fleet 1 Sebesar 319.176 Bcm Pada Bulan Maret 2018 Di Pit Muara Tiga Besar Utara , PT. Bukit Asam, Tbk. Skripsi thesis, Universitas Negeri Padang.
|
Text
12_A_M_ILHAM_MARDA_PUTRA_5766_15080039_2018.pdf Download (32kB) | Preview |
Item Type: | Thesis (Skripsi) |
---|---|
Subjects: | T Technology > TN Mining engineering. Metallurgy |
Divisions: | Fakultas Teknik > Teknik Pertambangan - D3 |
Depositing User: | Mrs. Dina Aulia Sari Dina |
Date Deposited: | 04 Mar 2019 02:55 |
Last Modified: | 04 Mar 2019 02:55 |
URI: | http://repository.unp.ac.id/id/eprint/21116 |
Actions (login required)
View Item |