Septiadi, Wahyu
(2018)
Proses Produksi Pembuatan Tiang Pancang dan Tiang Listrik dan Maintenenance pada Boiler Basuki 2.2188-2008 di PT. Jaya Sentrikon Indonesia.
Project Report.
Teknik Mesin FT UNP, Padang.
Item Type: |
Monograph
(Project Report)
|
Contributors: |
Contribution | Contributors | Email |
---|
Teacher | Ramli, Ramli | UNSPECIFIED |
|
Uncontrolled Keywords: |
Proses Produksi Pembuatan Tiang Pancang dan Tiang Listrik dan Maintenenance pada Boiler Basuki 2.2188-2008 di PT. Jaya Sentrikon Indonesia |
Subjects: |
T Technology |
Divisions: |
Fakultas Teknik > Teknik Mesin - D3 |
Depositing User: |
Mulyadi
|
Date Deposited: |
03 Nov 2023 01:24 |
Last Modified: |
03 Nov 2023 01:24 |
URI: |
http://repository.unp.ac.id/id/eprint/47924 |
Actions (login required)
|
View Item |