Sistem Terminasi 20 kV Menggunakan Kabel XLPE di Tambang Banko PT. Bukit Asam

Amanda, Affizah Restu (2023) Sistem Terminasi 20 kV Menggunakan Kabel XLPE di Tambang Banko PT. Bukit Asam. Project Report. Teknik Elektro FT UNP, Padang.

[img]
Preview
Text
ELO_DIII_TL_20064002_Affizah Restu Amanda_2023 1.pdf

Download (2MB) | Preview
Item Type: Monograph (Project Report)
Contributors:
ContributionContributorsEmail
TeacherMuskhir, MukhlidiUNSPECIFIED
Subjects: T Technology
Divisions: Fakultas Teknik > Teknik Elektro - D3
Depositing User: Ryan Muhammad Ichsan
Date Deposited: 25 Oct 2023 02:57
Last Modified: 25 Oct 2023 02:59
URI: http://repository.unp.ac.id/id/eprint/47669

Actions (login required)

View Item View Item