<mets:mets OBJID="eprint_47419" LABEL="Eprints Item" xsi:schemaLocation="http://www.loc.gov/METS/ http://www.loc.gov/standards/mets/mets.xsd http://www.loc.gov/mods/v3 http://www.loc.gov/standards/mods/v3/mods-3-3.xsd" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns:mods="http://www.loc.gov/mods/v3" xmlns:mets="http://www.loc.gov/METS/" xmlns:xlink="http://www.w3.org/1999/xlink"><mets:metsHdr CREATEDATE="2026-10-08T14:54:05Z"><mets:agent ROLE="CUSTODIAN" TYPE="ORGANIZATION"><mets:name>Repository Universitas Negeri Padang</mets:name></mets:agent></mets:metsHdr><mets:dmdSec ID="DMD_eprint_47419_mods"><mets:mdWrap MDTYPE="MODS"><mets:xmlData><mods:titleInfo><mods:title>Evaluasi Geometri Jalan Terhadap Produktivitas pada Pengangkutan Overbuden di Front 1 PT. EDCO Persada Energi Desa Bukit Peranginan Kecamatan Mandiangin Kabupaten Sarolangun Provinsi Jambi</mods:title></mods:titleInfo><mods:name type="personal"><mods:namePart type="given">Fachry</mods:namePart><mods:namePart type="family">Zulhamdi</mods:namePart><mods:role><mods:roleTerm type="text">author</mods:roleTerm></mods:role></mods:name><mods:abstract>Kegiatan produksi batubara di PT. EDCO Persada Energi dilakukan dengan sistem tambang terbuka, di mana aktivitas utama adalah pengangkutan overburden. Jalan angkut dari front 1 menuju disposal memiliki panjang 706,5 meter dengan 10 segmen yang terdiri dari 5 bagian lurus dan 5 bagian tikungan. Target produksi pada Februari 2025 sebesar 55.000 BCM/bulan, namun realisasi hanya mencapai 29.033,34 BCM/bulan. Penelitian ini bertujuan untuk mengevaluasi kesesuaian geometri jalan angkut berdasarkan standar Kepmen ESDM No. 1827 K/30/MEM/2018 serta menganalisis pengaruhnya terhadap produktivitas dump truck Mitsubishi Fuso 220 PS. Metode penelitian dilakukan melalui pengukuran parameter jalan, meliputi lebar, grade, cross slope, dan superelevasi, disertai pencatatan cycle time aktual. Hasil penelitian menunjukkan lebar jalan lurus berkisar 6,56–11,22 m dan pada tikungan 5,57–11,68 m, keduanya masih di bawah standar (9 m dan 12,42 m). Grade jalan -3,32–13,09% melampaui standar maksimal 8%, cross slope 1,39– 4,57% belum seluruhnya sesuai standar 2–4%, dan superelevasi 2,44–7,70% masih sebagian memenuhi standar 4–8%. Cycle time aktual rata-rata 12,41 menit menghasilkan produktivitas sebesar 32,40 BCM/jam. Setelah dilakukan simulasi perbaikan geometri sesuai standar, cycle time turun menjadi 5,52 menit dan produktivitas meningkat hingga 72,84 BCM/jam atau naik 49,48%. Perbaikan geometri jalan terbukti berpengaruh signifikan terhadap peningkatan produktivitas dan efisiensi operasi produksi. Kata kunci: geometri jalan, lebar jalan, grade, cross slope, superelevasi, produktivitas, tambang terbuka</mods:abstract><mods:classification authority="lcc">TN Mining engineering. Metallurgy</mods:classification><mods:originInfo><mods:dateIssued encoding="iso8601">2025-08</mods:dateIssued></mods:originInfo><mods:originInfo><mods:publisher>Universitas Negeri Padang;Teknik Pertambangan FT UNP</mods:publisher></mods:originInfo><mods:genre>Thesis</mods:genre></mets:xmlData></mets:mdWrap></mets:dmdSec><mets:amdSec ID="TMD_eprint_47419"><mets:rightsMD ID="rights_eprint_47419_mods"><mets:mdWrap MDTYPE="MODS"><mets:xmlData><mods:useAndReproduction>
<p xmlns="http://www.w3.org/1999/xhtml"><strong>For work being deposited by its own author:</strong>
In self-archiving this collection of files and associated bibliographic
metadata, I grant Repository Universitas Negeri Padang the right to store
them and to make them permanently available publicly for free on-line.
I declare that this material is my own intellectual property and I
understand that Repository Universitas Negeri Padang does not assume any
responsibility if there is any breach of copyright in distributing these
files or metadata. (All authors are urged to prominently assert their
copyright on the title page of their work.)</p>

<p xmlns="http://www.w3.org/1999/xhtml"><strong>For work being deposited by someone other than its
author:</strong> I hereby declare that the collection of files and
associated bibliographic metadata that I am archiving at
Repository Universitas Negeri Padang is in the public domain. If this is
not the case, I accept full responsibility for any breach of copyright
that distributing these files or metadata may entail.</p>

<p xmlns="http://www.w3.org/1999/xhtml">Clicking on the <em>Deposit Item Now</em> button indicates your agreement to these
terms.</p>
    </mods:useAndReproduction></mets:xmlData></mets:mdWrap></mets:rightsMD></mets:amdSec><mets:fileSec><mets:fileGrp USE="reference"><mets:file OWNERID="https://repository.unp.ac.id/id/eprint/47419/1/final_11_Fachry_Zulhamdi_22802012_9225_2025.pdf" SIZE="2296393" ID="eprint_47419_92532_1" MIMETYPE="application/pdf"><mets:FLocat xlink:type="simple" xlink:href="https://repository.unp.ac.id/id/eprint/47419/1/final_11_Fachry_Zulhamdi_22802012_9225_2025.pdf" LOCTYPE="URL"></mets:FLocat></mets:file></mets:fileGrp></mets:fileSec><mets:structMap><mets:div DMDID="DMD_eprint_47419_mods" ADMID="TMD_eprint_47419"><mets:fptr FILEID="eprint_47419_document_92532_1"></mets:fptr></mets:div></mets:structMap></mets:mets>