Increased Production Capacity Loading Equipment to Achieving the Production Target of 5000 tons/month in Clay Excavation Activities at the IUP OP Jumaidi Mine, Gunuang Sariak, West Sumatra

Frasetia, M. Deri (2023) Increased Production Capacity Loading Equipment to Achieving the Production Target of 5000 tons/month in Clay Excavation Activities at the IUP OP Jumaidi Mine, Gunuang Sariak, West Sumatra. Skripsi thesis, Universitas Negeri Padang.

[img]
Preview
Text
B1_11_M_DERI_FRASETIA_17137116_966_2023.pdf

Download (6MB) | Preview

Abstract

!UP OP Jumaidi is one of the mining business licenses engaged in mining, especially mining and clay trading, which is located in Gunung Sarik Village, Kuranji istrict, Padang City, West Sumatra Province. Based on field observations at the !UP OP Jumaidi, the authors found that production data in December 2021 produced only 2689.57 tons, while the production target to be sent to PT Semen Padang was 5000 tons/month. The Jumaidi !UP is currently experiencing several obstacles not achieving its production target caused by several factors, including weather factors, social factors, dust, work efficiency, poor road access, and hauling time for transportation equipment. The effective working time is 160 hours/month. Meanwhile, the actual effective working time is 120 hours/month. To get optimal production results, the efficiency and capabilities of the tools used must be considered. !UP OP Jumaidi has 4 excavators and 16 trucks for Loading and Hauling activities. Based on the author's observations !UP OP Jumaidi uses 1 excavator (excavator) serving 6 trucks in 1 place, this results in not achieving the production targets set by the company, from the author's observations there are problems with the waiting time of the tool (delay) on loading 3-5 minutes which which is very different from the company's rule of 1-2 minutes. Furthermore, the problem encountered by the author is the production of the means of conveyance, which is equal to 2617.4 72 tons I month, the match factor is 0.043 and the actual effective working time of the digging and conveyance equipment is 70%, this is not in accordance with the company's provisions, which is equal to 80%. The actual productivity data the means of transportation is 5941, 09 7 tons/month. The calculation of the effective working time the dumptruck is 46, 75 hours. The match factor value obtained is 0.17.

Item Type: Thesis (Skripsi)
Contributors:
ContributionContributorsEmail
Thesis advisorSaldy, Tri GamelaUNSPECIFIED
CorrectorYulhendra, DediUNSPECIFIED
CorrectorMaiyudi, RikoUNSPECIFIED
Subjects: T Technology > TN Mining engineering. Metallurgy
Divisions: Fakultas Teknik > Teknik Pertambangan - S1
Depositing User: Sri Yulianti, S.IP
Date Deposited: 02 Jan 2024 01:39
Last Modified: 02 Jan 2024 01:39
URI: http://repository.unp.ac.id/id/eprint/49225

Actions (login required)

View Item View Item